Water
The
Environmental Affairs Division (EAD) is committed to preserving
the beauty of its coastal surroundings and keeping the New River
clean. Wastewater collection, conveyance, and treatment
operations are owned and managed by MCB Camp Lejeune, but EAD
remains involved and stays abreast of water-related issues at
the Station. EAD has conducted studies and implemented changes
and upgrades in an effort to reduce water pollution.
A water conservation study was conducted in order to determine
methods of reducing water use at MCAS New River. 85% of the
water use at the Station is from residences and offices.
Water use worksheets were used in order to
gather data from throughout the Station. The data collected was
then reconciled with water usage records from the larger users
at the Station and the water treatment plant in order to
identify the largest users at the Station. Recommendations were
then developed for ways to reduce water usage for the top users.
|